Initiative · Project

Developing new products

Development is a relay race. It's lost at the handover.

Taking a physical or digital product from idea and requirements through design, prototypes and tests to production.

The situation

“We want to bring a new product to life.”

The idea is good, and there may already be sketches or a first model. Now come the questions that make development expensive: what exactly must the product do, at what cost, to which standards?

Then come the parties involved, who rarely talk to each other: design, engineering, software, purchasing, test lab and production. Every handover between them costs time and knowledge. And every change gets more expensive the later it comes.

Where it often goes wrong.

  1. Developing without a specification

  2. Design nobody can manufacture

  3. Back to the test lab

  4. Need assumed, not tested

  5. The device waits for the app

Which disciplines work together here.

You decide the scope.

Some teams bring us in only for requirements and feasibility, then carry on developing themselves. Others hand us engineering and prototypes, or just the route into production. We also go the whole way, from the first sketch to handover to the manufacturer.

Good questions. Straight answers.

Do you build prototypes and pre-series yourselves?

No, manufacturers from our network do. We have no workshops or labs of our own, but we know how to choose the right ones and steer them.

You have one point of contact for deadlines, quality and costs. Certificates are issued by notified or accredited bodies; we coordinate.

Can production stay with our current manufacturer?

Yes, if quality, capacity and price are right. We then involve them early in the design, so the product fits their processes. If there's no suitable manufacturer, we find and qualify new suppliers.

Will you also take the product to market afterwards?

Yes. Price, positioning, sales materials and delivery readiness are covered in Launching a product. Link the two early: target price and target group already belong in the specification.

Can you say upfront how long development will take?

Only as a range. The biggest uncertainties lie in testing, approvals and lead times for tooling.

So we plan in stages with clear approvals, and you always know where the project stands. We talk through your starting point in the free Initiative Check.

Proof first. Contract second.

In the free Initiative Check, we listen for 45 minutes and ask the questions that usually only come up after the contract is signed. Then you get a short written assessment: what we see, how we would go about it and roughly what it would take.

No obligation. And if we're not the right fit, we'll tell you.